add share buttonsSoftshare button powered by web designing, website development company in India

MEP Coordination

now browsing by tag

 
 
Posted by: | Posted on: July 28, 2020

Typical Stages Involved In MEP Coordination

One of the comprehensive practices carried out in the pre-construction phase is the MEP coordination that requires special attention from all AEC professionals involved in a project. This ensures that the architectural design process of the building and its structural framework does not interfere or conflict with, electrical, mechanical, plumbing systems, and fire protection. 

While the coordination process MEP can vary from one company to another, depending on the needs of the customer and the level of detail (LOD). You can also visit www.bmoutsourcing.com/services/3d-rendering-and-visualization/ to find out the best professionals to accomplish all of your tasks related to this.

Typical view of MEP systems coordinated in a 2D paper-based ...

Image Source: Google

Below are some of the typical steps involved in it:

Design Review Of Consultant Drawings And Structural Plans: 

At this preliminary stage, the signature responsible for coordinating MEP drawings typically receives a single line of MEP consultants or contractors. Moreover, the architectural and structural plans are discussed in detail. In addition to evaluating these drawings and designs for consistency with schematics, specifications MEP are studied. Based on this analysis, the service provider establishes a leaf MEP coordination route.

3D Model Creation:

The use of flat design consultants received at the initial stage, the service provider coordination MEP creates an accurate 3D model, either using Revit or AutoCAD. This model shows all the MEP services in architectural and structural limitations of the building. The complete 3D model here lays the groundwork for several other important sets of construction-related drawings – plans, sections or elevations. Moreover, this 3D model will be used for entries in the client and for creating detailed tutorials.

Clash Detection And Resolution:

At this stage, the service provider MEP coordination evaluates the 3D model created in the previous step, by conflicts and clashes between the architectural and MEP systems. This is done using Navisworks, a software application testing specialist interference. Any inconsistencies, including clashes related to difficult geometry, clearance clashes, and confrontations workflow, if any, are detected here and viable alternatives for the same are provided to the client.